Bridge Structure

BRIDGES

The SCON organization's Bridge Division is highly skilled in manufacturing, supplying, and installing state-of-the-art bridges. Their expertise includes prestressing systems such as HDPE corrugated sheathing, anchorage cone, and anchorage heads wedges. They also excel in the installation of various bridge bearings, including POT-PTFE bearing, elastomeric bearing, pin metal bearing, and spherical bearing. In addition, they specialize in structural expansion joints such as strip seal, seal, and modular. Their vast range of services includes the supply of prestressing equipment with hydraulic jacks from 5 ton to 1000 ton capacity, hydraulic pump, grouting dund, etc.

bridge1.png

01

KHARGHAR SKY WALK CABLE STAY, MUMBAI (2012)

Weight of strands 8 Tons

Main Span-70M+51M

Client Name: City & Industrial Development Corp (CIDCO)

Contractor: J Kumar Infra Projects Ltd.

Design Consultant: Spectrum Techno Consultants Pvt. Ltd. Structural Engineer

bridge2.png

02

ZUARI RIVER CABLE STAY, GOA

Weight of strands 1200MT

Main Span - 360M

Client Name: Ministry of Road Transport & Highways, New Delhi, Govt Of India

Contractor: Dilip Buildcon Ltd., Mostobudivelnule Zahin

No (DBL-MBZ(.V.))

Design Consultant: Ingerop Consultant, France Infinite Civil Solutions Pvt Ltd. Multimedia Consultants S.N. Bhobe & Associates

bridge6.png

03

MAHATMA MANDIR CABLE STAY GANDHINAGAR, GUJRAT (2016)

  1. Weight of strands 15 Tons

  2. Main Span-150M+90M

  3. Client Name: Government of Gujrat, Road & BuildingDept.

  4. Design Consultant Contractor: SPCL & AFCONS

bridge4.png

04

MITHAPUR CABLE STAY BRIDGE, PATNA, BIHAR

  1. Weight of strands 50 Tons

  2. Main Span - 37M+74M+37M

  3. Client Name: Bihar Rajya Pul Nirman Nigam Limited,Patna

  4. Design Consultant Contractor: Spectrum TechnoConsultants Pvt. Ltd.

  5. Contractor: S.P. Singla Construction Pvt. Ltd.

bridge5.png

05

GIFT CITY CABLE STAY BRIDGE ,GUJRAT

  1. Main Span - 20+41.8+41.8+20 Mtr.

  2. Client Name: Gandhinagar Municipal Corporation

  3. Contractor : Ajay engineering Infrastructure Pvt.ltd

bridge6.png

06

​ VENGURLA PEDESTRAIN CABLE STAYED BRIDGE, VENGURLA, MAHARASTHRA (2022)

  1. Weight of strands 3.1 Tons

  2. Client Name: Executive Engineer Public Works Division,Sawantwadi Govt of Maharashtra.

  3. Design Consultant Contractor: MANOJA STHAPATYA,Pune

  4. Contractor: TENSILE MEMBRANE SYSTEMS PUNE Pune

bridge7.png

07

Hanogi Cable stayed bridge at Mandi,Himachal (2022)

  1. Main Span-95m span cantilever 20m pylon ht.Client Name: HIMACHAL PRADESH P.W.D. (SERAJDIVISION)

  2. Design Consultant Contractor: Spectrum TechnoConsultants Pvt.Ltd

  3. Contractor: AJAY KUMAR SHARMA CONTRACTOR

IMG_8069_edited.jpg

08

Naluchira Cable Stay Bridge,Kerala

  1. Main Span - 75 + 150 + 75

  2. Client Name:Kerala Infrastructure Investment FundBoard (KIIFB)

  3. Contractor: Kurickal Developers LLP