Bridges span are sometimes gets displaced due to thermal movement, increased in the traffic load and failure of bridges bearings and sometimes due to natural disaster.
 

Lifting Of Span , Realigning the disturbed spans i.e super structure of Bridge for replacement of bearings and including all higher and running expenses of all plants, Hydraulic jacks, Power Packs, Generator Set, Welding Machines and Equipment, temporary platform and temporary supports, required for keeping the superstructure in lifted position for completing the operation. Lowering of superstructure on new Elastomeric Bearings without causing any approved detrimental effect to any part of the bridge structure Size complete. Surface preparation i.e. leveling of top surface of pedestal and carrying out minor repairs works so as to carry out proper installation of new Elastomeric Bearings for equal distribution of load.

0T7A1178 (Medium).jpeg
Scon logo

Head Office

110-111,R. Plazzia, Swastik Regalia, Kavesar, Waghbil Road, Off Ghodbunder road, Thane (west), 400607, Maharashtra, India

Manufacturing Units

H. No.2991, Babosa Industrial Park, Saravali Village, Nasik Highway, Bhiwandi - 421302, Maharashtra, India

Registered Office

Office No 17, Gorai Matruashish CHS. Ltd.,Opp Azara bank,Gorai-II, plot no. Sc-5,RSC - 52, Borivali (W) - 400092, Maharashtra, India

Plot No. 3, G/F, KH No. 451A, Village Matiala, Uttam Nagar,

New Delhi - 110 059.

Delhi, India

+91 9324516701

022-49708782

© 2025 SCON INFRA PRESTRESS LLP

bottom of page