top of page

Hybrid PT System (Bonded + Un-Bonded)

Hybrid Bonded and Un-Bonded system can be mixed within a single structure. The Un-Bonded PT System can be used in slab, while the Bonded PT system can be specified for transfer girder/ Plate and PT Beams to provide optimum crack and deflection control feature, essential for transfer girder require to carry the load from multi-storey structure.

  • Quick installation
  • Economical Design and Construction
  • Use of Enhanced advantage of Bonded and UN-Bonded PT System
  • Customised
0T7A1178 (Medium).jpeg
Scon logo

Head Office

110-111,R. Plazzia, Swastik Regalia, Kavesar, Waghbil Road, Off Ghodbunder road, Thane (west), 400607, Maharashtra, India

Manufacturing Units

H. No.2991, Babosa Industrial Park, Saravali Village, Nasik Highway, Bhiwandi - 421302, Maharashtra, India

Registered Office

Office No 17, Gorai Matruashish CHS. Ltd.,Opp Azara bank,Gorai-II, plot no. Sc-5,RSC - 52, Borivali (W) - 400092, Maharashtra, India

Plot No. 3, G/F, KH No. 451A, Village Matiala, Uttam Nagar,

New Delhi - 110 059.

Delhi, India

+91 9324516701

022-49708782

© 2025 SCON INFRA PRESTRESS LLP

bottom of page